Precision, economy and a faster path to a watertight superstructure
THE NEED FOR PRECISION & RELIABILITY
The construction industry is already moving toward systems-based operations that shift traditional field work into controlled off-site facilities, backed by standardized build processes that ensure benchmarked quality standards. A-LINX delivers all the benefits of precision, factory-based component assembly.
THE NEED TO MANAGE TOTAL COSTS
Value-streamed assembly processes maximize production efficiencies and streamline component delivery to the site. Front-loaded planning allows for value engineering and for cost-containing strategies to be designed into the entire structure. In every aspect, the A-LINX approach drives competitive costing.
THE NEED TO REDUCE ERECTION TIME
Pre-fabrication reduces build times on site by 20% compared to traditional methods. It significantly reduces weather-related delays allowing you to get to a watertight superstructure in previously unthinkable timeframes. Interior finishes can advance at an accelerated pace and clients enjoy a shorter timeline to facility opening and occupation.
SUMMARY OF BENEFITS TO OFFSITE CONSTRUCTION
- Reduced number of skilled workers needed on site
- Enhanced workmanship and factory-built precision
- Improved quality control and production efficiencies
- Reduced time to watertight superstructure
- Reduced total superstructure install costs